Ann Arbor Wood Flooring logo
Empty living room with a freshly refinished red oak strip floor, white trim, tall double-hung windows and a staircase

Hardwood Floor Installation in Ann Arbor

Ann Arbor Wood Flooring is a free referral line to one independent local contractor for hardwood floor installation: solid 3/4 inch strip and plank fastened with cleats or staples hidden in the tongue, over plywood or OSB, finished on site or bought prefinished from the mill, then trimmed out with thresholds, reducers and quarter round. Moisture readings come before any of that, because solid wood that goes down too wet or too dry will gap or cup later. You call us, we pass the job on, and the contractor comes out to measure. Their written estimate is free.

Get a free wood flooring estimate

Free for homeowners. One local contractor contacts you.

Hardwood Floor Installation Methods for Solid Wood

Installer's hands setting a pneumatic flooring nailer against the tongue of a solid oak board

Nail-Down Solid Strip and Plank Floors

Solid hardwood is one piece of wood from top to bottom, and the NWFA rates it for any room on or above ground. Boards under 3 inches wide count as strip, and anything 3 inches or wider is plank. Both are fastened the same way: a flooring nailer drives a cleat or staple through the tongue at an angle, so the next board's groove hides it.

The fastener schedule is not a matter of taste. For plank, NWFA guidance printed in Hardwood Floors Magazine calls for 1-1/2 to 2 inch fasteners every 6 to 8 inches and 1 to 3 inches from each end. Boards go perpendicular to the joists, or on a diagonal, over a single-layer subfloor. Ask how your installer plans to run the boards if the room's long axis and the joists disagree.

Before the first row, the installer should meter both the flooring and the subfloor. The NWFA allows no more than 4 percent difference for strip and 2 percent for plank, and a dry wood subfloor usually reads 12 percent or less. Acclimation is finished when those readings line up, not after a set number of days. A good installer writes the readings down. The subfloor also has to be flat; tolerances and fixes are on subfloor repair.

Raw unfinished oak boards freshly nailed down with a sanding machine waiting in the doorway

Site-Finished (Unfinished) Hardwood

Unfinished boards are installed raw, then sanded flat and finished in place. Sanding takes out small height differences between boards, so the floor ends up as one smooth surface with tight, square seams. It also means any stain color is possible, chosen on samples brushed onto your own floor. The sanding and finishing steps are the same as on hardwood floor refinishing.

The cost is time. Fixr notes that a site-finished floor may stay off limits for two or three more days while coats dry, and the house gets the dust and smell of a sanding job. Our view: site-finished is worth it when new boards have to meet an old floor or a custom color, or in a gut renovation where nobody is living in the rooms yet.

Prefinished solid oak planks with factory-coated surfaces and small beveled edges stacked beside a half-finished room

Prefinished Solid Hardwood

Prefinished boards are sanded, stained and coated at the mill, so installation is the whole job. Fixr says they can be walked on as soon as they're down and prefers them for remodels where a family is still living in the house, partly to limit exposure to finish fumes. There's no sanding dust either, which matters when the kitchen stays in use. Most have small beveled edges, which hide slight height differences between boards that a sander would otherwise flatten.

Two things to weigh. Factory finishes are hard, and some are difficult to recoat later; screen and recoat explains which ones. The bevels also collect grit in a kitchen. Ask for the exact product, finish type and edge profile in writing so a future repair board can be matched.

New unfinished oak boards woven into an older oak floor where kitchen tile was removed, end joints staggered

Weaving New Hardwood into an Existing Floor

Extending a floor into a former tiled kitchen, a closet or a new addition is common in older Ann Arbor houses. A clean extension doesn't stop in a straight line. The installer cuts back the old boards at staggered lengths and weaves the new ones in, so end joints keep the same random pattern as the rest of the floor. Matching species, width and thickness matters more than matching color, because color is changed later by sanding both areas together. The NWFA notes color only changes once the floor is sanded to raw wood, so plan to refinish the whole connected area at the same time.

Moisture matters even more here. The old floor has years in the house; the new boards came off a truck. Meter readings on both should be close before nailing.

Oak T-molding transition between a new hardwood floor and an adjoining floor at a doorway

Transitions, Thresholds and Quarter Round

Trim is where an install looks finished or doesn't. A T-molding joins two floors of the same height, a reducer steps down to thinner flooring such as vinyl, and a threshold sits under an exterior door. At the walls, solid floors need room to move. The general rule cited in Hardwood Floors Magazine is about 3/4 inch, hidden under base shoe or quarter round. Where new flooring raises the floor, doors may need trimming; that work is on replace carpet with hardwood. At stair landings, a stair nose matched to the floor finishes the edge (see hardwood stairs).

Ask whether the trim is stained to match on site or bought prefinished, and who removes and reinstalls the baseboards.

Hands pressing a pin moisture meter into a sanded oak board beside stain sample boards and a tape measure

Why Ann Arbor homeowners call Ann Arbor Wood Flooring

  • Free estimate, and you can ask for it in writing, species and finish named
  • One independent local floor contractor gets your request, not a call list
  • No fee to homeowners for the referral
  • Ask for moisture readings before any new floor goes down

Get a free wood flooring estimate

Free for homeowners. One local contractor contacts you.

How Long Does Hardwood Floor Installation Take?

For a typical house, the boards go down in a few days: Fixr says jobs under 1,500 square feet are usually done in less than three. Prefinished floors are usable the same day. Site-finished floors add two or three more days for sanding and coats, and acclimation can add time before work starts.

The calendar often depends more on moisture than on square footage. Boards delivered in a humid August week may need longer to reach the house's moisture content, and Ann Arbor's dry winters work the other way (the homepage covers indoor humidity). That's why we'd ask the contractor to bring the flooring early and take readings, rather than book install day and delivery day together.

What to Have Settled Before Installation Day

Before the crew arrives, settle the board direction, the transitions at every doorway, who moves the furniture and removes the old flooring, and the moisture readings for both the flooring and the subfloor. Each of those should be written on the estimate, with a price where one applies.

  • Old flooring

    Carpet, pad and tack strip, or vinyl and tile, come up first. Find out what's under them before the bid, since it changes the prep.
  • Subfloor

    Squeaks and soft spots get fixed now, not after the hardwood covers them.
  • HVAC

    Heat or air should be running at normal living conditions.
  • Price

    For per-square-foot ranges and examples, see hardwood floor installation cost.

Related: engineered hardwood installation for slabs and basements, wide plank hardwood flooring, and the overview of hardwood floors in Ann Arbor.

Frequently asked questions

How long should hardwood flooring acclimate before installation?

There's no fixed number of days. Acclimation is done when a moisture meter says so: the NWFA wants strip flooring within 4 percent of the subfloor's moisture content, and wider plank within 2 percent. Contractors quoted in Hardwood Floors Magazine call the seven-to-ten-day rule the biggest misconception they deal with.

Should hardwood floors run perpendicular to the floor joists?

Yes, as a rule. NWFA guidance says solid plank goes perpendicular to the joists, or on a diagonal, over a single-layer subfloor, because boards that run parallel can sag between joists. There are exceptions, such as a thicker or double-layer subfloor, so ask the installer to check before choosing the direction.

Should I install solid or engineered hardwood?

Solid hardwood suits rooms on or above grade over a wood subfloor, and the NWFA notes it can be sanded and refinished many times. Engineered moves less with humidity, so it's the usual pick for basements and concrete slabs. On a main floor over plywood, either works; the choice comes down to look, budget and future sanding.

Is prefinished or unfinished hardwood better?

Prefinished goes in faster, can be walked on right away and is often preferred for remodels where people are living in the house. Unfinished boards are sanded flat after installation, so the seams disappear and you can choose any stain. Fixr found the installed cost of the two comes out close once on-site finishing is counted.

Can new hardwood be matched to an existing floor?

Usually, if the species, width and thickness match. New boards are woven into the old ones so the end joints stagger, and then both are sanded and finished together. Color only evens out on bare wood, so a new section beside an old finished floor will look different until the whole area is refinished.

Ready to get started in Ann Arbor?

Request a free estimate